The Master Plan is a 20 year plan to understand the needs of current and future users of the airport. This is important to ensure that safe and orderly development occurs in a manner that is reflective of the community's values and goals.  The plan is developed through a purposeful, inclusive and educational process.


STUDY GOALS - The purpose of this process is to update the Yampa Valley Regional Airport (YVRA or HDN) Master Plan and Airport Layout Plan drawing set (ALP) and determine the extent, type, and schedule of development needed to accommodate future aviation demand at the Airport over a 20-year planning period.  The HDN ALP was revised to reflect updated geometry from design and construction in 2012. The last Master Plan was updated in 2003, with the following main objectives:

  • Determine the condition and adequacy of existing facilities over the 20-year planning period
  • Forecast aviation activity, including operations and based aircraft
  • Recommend needed facility improvements to accommodate forecast demand and safety requirements while addressing the values and economic growth plan of the community
  • Prepare a financial plan that considers HDN's budget, revenue, and expenses as well as future funding scenarios


MASTER PLAN UPDATE 5/27/14

Master Plan PAC Presentation 04/09/15

Working Paper - One Draft - Chapter 1 Introduction

Working Paper - One Draft - Chapter 2 Inventory

Working Paper - One Draft - Chapter 3 Aviation Activity Forecasts

Working Paper - Two Draft - Chapter 4 Facility Requirements

Working Paper - Three Draft - Chapter 5 Alternatives Analysis

Working Paper - Four Draft - Chapter 6 Financial Implementation Plan

Appendix A - Aviation Glossary

Appendix C - Yampa Valley Regional Airport Enplanement Analysis